Contract Date:
02.01.2015
Finished:
15.05.2016
Location:
İstanbul, Turkey
Atatürk Airport Terminal Capacity Increase
Within the scope of the project, turnkey tank manufacturing and assembly works, 1 piece of 3.000m3 Fire Water Tank, 2 pieces of 8.000m3 JETa1 Storage Tank were built.